Case Study

Armco Barriers Where It Matters

Armco and handrail barriers installed across a grocery distribution centre to protect people, racking and stock from vehicle impact.

Client
Confidential grocer
Sector
Grocery distribution
Scope
Armco & handrail barriers
Region
South East
Timescale
Phased install

The Challenge

Vehicles, People,Racking.

Busy vehicle routes ran close to walkways and racking ends. The site needed clear segregation and impact protection in the right places.

  • RiskVehicle impact
  • NeedClear segregation
  • ConstraintLive traffic routes

Our Approach

Survey, Plan,Fix, Sign Off.

We walked the site with the team, marked out where protection was needed and planned the install around traffic, then our own installers fitted the barriers section by section.

  1. Step 01 Site walk Risk areas marked.
  2. Step 02 Layout planned Around live traffic.
  3. Step 03 Barriers fitted Section by section.
  4. Step 04 Signed off RAMS on site.

The Result

Clear Routes,Protected Ends.

Walkways are now segregated from vehicle routes and racking ends are protected, with the site running as normal throughout.

“Clear, safe routes for people and vehicles.”

Start a Similar Project

Before & After

See the Difference

Before
After
Before After

The Results

Delivered at Scale.

Barrier protection installed across live traffic routes, section by section.

100%

Risk areas covered

Every marked point protected.

1

Site walk

Planned with the site team.

0

Days of lost picking

Installed around live traffic.

1

Managed team

Our own installers, start to finish.

Client testimonial to be supplied by Adept. A short quote from the site manager about the speed, accuracy and the team on site works best here.

Client name · Role, Company